RTA participated in the June 8th Priest Gulch trail work day hosted by the USFS. Together with members of the San Juan Trail Riders and Mancos Trails Group, we were refreshed on safety, trail clearing protocol, and lots of techniques. In the photo below, USFS Ranger Jordan points out a “junk wall” constructed with large branches and rocks inside a switchback corner.
RTA Joins in Priest Gulch Trail Work Day
Previous
Previous
UPDATE: 3rd Annual RTA Fundraiser on August 17th was Amazing!
Next
Next